Spring is the busiest season for metal building installations. Everyone wants their structure up before summer, and that rush often leads to delays, higher costs, and missed opportunities. What many buyers don’t realize is that spring delays usually begin much earlier, often because January preparation was skipped.
January is not just a quiet winter month. It’s the most strategic time to plan your site, finalize decisions, and secure your spot in the spring installation schedule. With the right preparation, you can avoid last-minute stress and move into spring fully ready. We are going to walk you through exactly how to do that.
January sets the tone for your entire project timeline. While installation may happen in spring, manufacturers, installers, and suppliers plan their schedules months in advance. When buyers wait until March or April, they often face long lead times and limited availability. Planning in January gives you breathing room. You have time to prepare the site, finalize permits, lock designs, and take advantage of seasonal offers. This early action also helps secure your place in the production queue, which directly affects how quickly your building is installed once spring arrives.
When site preparation is pushed into late winter or early spring, problems pile up quickly. It happens because contractors are fully booked, permits take longer, and weather conditions can slow down groundwork. Even small delays can push installation weeks or months later than expected. This is why January preparation matters.
It prevents rushed decisions and keeps your project moving forward when others are stuck waiting. Scroll down to know about the preparation steps in detail, so you don’t have to wait long to kick off your project.
The first and most important step is preparing your installation site. No matter how good the building is, installation cannot move forward if the site is not ready. This stage connects directly to delivery timelines. A prepared site allows installers to work efficiently and avoids rescheduling, which is common during peak spring months.
A proper foundation ensures structural stability, speeds up installation, and prevents future issues. When foundation decisions are delayed, installation dates are often pushed back. January planning keeps everything aligned so your structure is ready the moment spring conditions allow construction.
Once the site is ready, it’s time to finalize what you are building. This step is where many delays happen because buyers underestimate how long design decisions take. Finalizing the building type early ensures production can begin without interruptions.
When these decisions are made early, manufacturers can schedule fabrication smoothly. Waiting until late winter often means redesign requests and production delays. January allows you to plan smarter and move faster once spring arrives.
Agricultural buildings need special attention; that is why we are covering them here. Structures such as steel livestock shelters and a poultry steel barn require proper drainage, ventilation planning, and zoning checks. These steps can take time, especially in rural areas. Preparing in January ensures these details are handled before spring demand increases. Farmers who plan early often get priority installation, while those who plan late face long waiting periods during peak farming season.
Once your site and design are finalized, ordering early will benefit your project. We share your design details with manufacturers only after you confirm the design. They begin the production schedules, which fill quickly as spring approaches. This is where early buyers gain a major advantage. Manufacturers prioritize orders placed earlier in the year. Early orders move through production faster because factories are not yet overloaded with spring demand.
Moreover, ordering a metal building in December or January helps you lock in the structure at a low price, secure production slots, and avoid seasonal price increases. It also ensures your building is ready for delivery as soon as spring installation conditions are favorable. There are many benefits and things to consider when ordering a metal building in December.
January is not just about preparation; it’s also about savings. Many suppliers offer early-year promotions to encourage off-season planning. These offers do more than reduce cost; they help secure space.
Financial Benefits of Acting Early in the Year: January sales let buyers lock in deals before prices rise in spring. Early commitments also make scheduling easier because suppliers prioritize confirmed orders.
How January Planning Helps You Qualify for Rebates and Better Deals?
Planning early gives you time to qualify for local tax rebate programs as well. Mostly, they apply to agricultural or commercial metal buildings. These rebates often require paperwork, inspections, and approvals, which are much easier to manage without spring pressure. Combining January sales with rebates significantly improves project value and reduces overall investment costs.
Have you done planning, ordering, and site preparation? Now, the final step is reviewing installation readiness. For this, talk to the experts at 877-801-3263 and decide on a delivery time that suits you. You can call this number at any stage of the ordering process, and even before deciding on the steel building.
Moreover, when you confirm delivery access, equipment space, and, if required, utility connections, these final checks prevent last-minute surprises on installation day. Apart from it,
choosing the top features in a durable carport, garage, sheds, barns, or building early helps avoid change orders later. Features like reinforced framing, upgraded roofing, and proper anchoring enhance durability and reduce maintenance. These steps are crucial because when add-ons are selected during January planning, installation flows smoothly without interruptions.
So, this is why preparing your site in January is the smartest way. Early planning allows you to secure space, lock offers, and ensure priority delivery when installation season begins. From foundations to design decisions, early action keeps your project moving while others wait. At Viking Steel Structures, we make the process simple. Our team is known for delivering customized metal buildings with fast, reliable installation and strong attention to detail. Built with high-quality steel frames, our structures are designed to stand strong for years, giving you a durable space you can trust, season after season.
Cheer the new year with smart savings. Fill form to get your offer today.
Looking for a metal building that fits your needs?
GOOD Based on 290 reviews Wayne Holmes2024-11-05Trustindex verifies that the original source of the review is Google. Jadon Welborn. Was great to work with , he had to redo the building several time and at my request. Was very understanding and helpful. Great Salesman. Benjamin Chartier2024-10-21Trustindex verifies that the original source of the review is Google. Dealing with Vicking was an experience. The cost was in my ball park. Chris was great. We had some hiccups with the flooding from a hurricane. Best Choice Metal Structure was my contractor. Tony Tony and Smiley aka Pedro. They were great. They worked morning till dark. Had to ask them to stop one night cause I couldn't see them in the dark. Great building and Crew. Thanks Ben Building in Warner NH. William Strickland2024-10-18Trustindex verifies that the original source of the review is Google. Jadon Welborn was very kind, helpful, and prompt. I would highly recommend using Viking Steel Structures. Michael Thomson2024-10-16Trustindex verifies that the original source of the review is Google. Chris made all of this possible and really helped me get exactly what I needed! Thank you viking! Shane Halloran2024-10-09Trustindex verifies that the original source of the review is Google. Brett, Was a huge help with the planning and purchase of my building. He took care of everything and made this a pleasant experience.
209 N Bridge St Elkin, NC 28621
Mon to Thu : 09.00 AM - 06.00 PM
Fri : 09.00 AM - 05.00 PM
Like a Viking metal building? Use this form to get a free quote.
New Year Sale
Save Up to 30%
on Metal Buildings Over $10K
*Offers available in selected states. Discounts may vary by location.